White Oak Bayou Greenway runs from northwest Houston down to Allen's Landing downtown, where White Oak Bayou meets Buffalo Bayou. Houston Parks Board counts more than 18 miles of public greenspace and hike-and-bike trail along it inside city limits. In the Heights it's the wide concrete path by the bayou, and it forms a loop with the Heights MKT Trail. Every fact below comes from a park, city or trail group page, listed under Sources. Several sections are under construction this fall, so read the closures part before you plan a long run.
The trail at a glance
Parks along the greenway include Watonga Parkway Park, home to one of Houston's largest bat roosts, plus T.C. Jester Park, Stude Park, White Oak Park and Hogg Park. In 2018 the trail was tied into the Buffalo Bayou trail at the foot of the University of Houston-Downtown, so you can keep going west toward Buffalo Bayou Park and Memorial Park.
- Length: TrailLink lists 22.7 miles between the Jersey Village Hike and Bike Trail and Johnny Goyen Park (1 N. Milam St.) downtown. The Heights Trail Partnership measures the busiest piece, from the MKT Trail to downtown, at 4.75 miles.
- Surface: concrete and asphalt. The newer western sections that Houston Parks Board built are 10 feet wide and concrete.
- Who's on it: the city treats its trails as multi-use unless a sign says otherwise, so expect bikes and keep right.
- Connections: the Heights MKT Trail, the 11th Street Bikeway and the Paul Carr Jogging Trail on Heights Boulevard.
- Transit: METRO routes 27, 30, 40 and 56 serve the Heights stretch, according to the Heights Trail Partnership.
The Heights loop with the MKT Trail
The Heights Hike and Bike Trail, usually called the MKT Trail, follows the old Missouri-Kansas-Texas rail line through the Heights. TrailLink puts it at 4.6 miles of concrete between T.C. Jester Boulevard and Hogan Street. It crosses White Oak Bayou Greenway three times, at the Hogan, Studewood and Cottage Grove bridges, and the Heights Trail Partnership says the two trails together make a 7.5-mile loop with few street crossings.
The pieces came together over about a decade. The MKT and Nicholson trails opened in 2010. A new bridge west of May Street replaced the old MKT railroad bridge in 2015. A 2-mile segment from west of Studemont Street to near the Moy Street bridge opened in December 2016, with links to Harvard, Bonner, Patterson and Yale streets and Heights Boulevard. Look down between Heights and Yale and you'll see brick saved from the old Yale Street Bridge set into the trail. The last connector between Stude Park and the MKT Trail was finished in 2022.
You can't run the full loop right now. The city lists the MKT Hogan Street pedestrian bridge as closed since Sept. 22, 2025, until further notice. The Studewood bridge reopened in June 2026 after a long closure. The Heights Trail Partnership's advice for now is to plan on detours, expect a few blocks on the street near Studewood and I-10, and think about out-and-back runs or partial loops.
T.C. Jester Park and the northwest stretch
T.C. Jester Park, at 4201 T.C. Jester Blvd., is one of the parks on the greenway and a handy place to start a run in either direction. The city's dog park there opened in 2009 and has separate runs for big and small dogs, with drinking fountains for dogs in both.
Northwest of the park the trail keeps going toward the city limits. Houston Parks Board opened a 10-foot concrete trail from Antoine Drive to Alabonson Road in 2015, with a bridge over the bayou next to Alabonson. It extended the trail from Alabonson to the Hollister Detention Basin, at Shady Grove Lane and Langfield Road, in 2018. That piece connects to Woodland Trails Park and nearby streets. Harris County Flood Control District plans to carry the greenway farther into the county. TrailLink reviewers between 2021 and 2024 reported construction and missing sections out west, so check conditions before you count on a long run there.
Parking and getting there
- T.C. Jester: TrailLink lists trail parking at 4219 T.C. Jester Blvd.
- Stude Park: 1031 Stude St., on the Heights stretch, where TrailLink also lists parking. City hours are 6:30 a.m. to 11 p.m. daily. The Stude pool has been closed since July 2025.
- Northwest end: TrailLink lists parking at 6999 Alabonson Rd.
- No car: METRO routes 27, 30, 40 and 56 (see above), or ride over from the Buffalo Bayou trails downtown.
We couldn't find an official list of restrooms or water fountains along the greenway itself, so carry water on longer runs.
Closures and detours right now
These are the alerts posted by the Houston Parks Board trail closure map and the Heights Trail Partnership as of November 24, 2026. Check both before you go, since dates move.
- Near North Shepherd: closed since Aug. 31, 2026 for a slope stabilization issue caused by recent rains. Harris County Flood Control District is assessing and working to stabilize the area. Use the MKT Trail as the detour until further notice. No reopening date is set yet.
- Chateau Forest area, northwest stretch: the greenway between Hidden Arbor Lane and Oak Bough Drive is closed for a Houston Public Works drainage project, expected to last through January 2027. Detour for northbound runners: exit at Victory Drive, go west on Victory to W. Little York Road, continue to Hollister Street, then north along the detention basin to rejoin the greenway. Southbound reverses it. Do not enter fenced construction areas.
- Under I-10 near Studemont: closed for TxDOT's I-10 elevation project, listed through March 11, 2027. A switchback takes you up to street level at Studemont, but the group says the busy intersection and patchy sidewalks make getting back to the MKT Trail awkward.
- Houston Avenue to the Castillo Community Center: closed since Jan. 15, 2026 for I-45 and I-10 ramp work, expected through 2028 with a posted detour. It may reopen now and then during the project.
- Downtown confluence: The Heights Trail Partnership lists the Buffalo Bayou trail detour near Johnny Goyen Park and UH-Downtown as ended (Oct. 31, 2026).
- MKT Hogan Street bridge: closed since Sept. 22, 2025, until further notice, per the city.
More work is coming. The Heights Trail Partnership expects the North Canal Project to affect trail access near Yale Street and Heights Boulevard. TxDOT's I-10 project is building new trail on the south bank between Studewood and Hogan, and new bridges at Patterson Street and Rutland Street are planned to restore the loop.
Upcoming races on the greenway
These come from the Run Houston race list. Click a race name for details, or Register to go to its sign-up page. See every race on the race list.
T.C. Jester Park
- : Jingle Bell Run Houston, a timed or untimed 5K at 8 a.m. at T.C. Jester Park (4205 T.C. Jester Blvd.) benefiting the Arthritis Foundation. Register
Nothing on the greenway is coming up right now. Check the full race list.
Sources
- Houston Parks Board: White Oak
- Houston Parks Board: Project history, White Oak Bayou
- Houston Parks Board: Bayou Greenways trail closure map
- City of Houston Public Works: Chateau Forest area drainage project
- Harris County Flood Control District: maintenance
- Heights Trail Partnership: White Oak Bayou Greenway
- Heights Trail Partnership: The Heights MKT Trail
- Heights Trail Partnership: Closure near N. Shepherd
- Heights Trail Partnership: Closure near Studemont
- Heights Trail Partnership: Closure near Houston Ave.
- Heights Trail Partnership: Buffalo Bayou trail detour near UHD
- Houston Parks and Recreation Department: closures
- Houston Parks and Recreation Department: Trails
- Houston Parks and Recreation Department: Dog parks
- Houston Parks and Recreation Department: Stude Park hours
- TrailLink: West White Oak Bayou Trail
- TrailLink: MKT Trail/Heights Hike and Bike Trail
- Jingle Bell Run Houston on RunSignup
Spot something out of date? Email hello@runhouston.app. More Houston running guides are on the way, and you can find people to run with on the clubs page.